Troubleshooting
Install
Dimension
Maintenance
Configuring Units for Downflow Vertical Discharge
Electrical Controls and Wiring
Symptom
Burner Assembly
Special Procedures for 208-VOperation
Start-upHeating and Make Adjust- ments
Page 29
Image 29
48EZ
A--
A10208C
Fig. 15 -
208/230-3-60
Connection Wiring Diagram, Unit
48EZ-A
29
Page 28
Page 30
Page 29
Image 29
Page 28
Page 30
Contents
SAFETY CONSIDERATIONS
TABLE OF CONTENTS
Fig. 1 - Unit 48EZ-A
Installation Instructions
Installation on older “G” series roof curbs
RECEIVING AND INSTALLATION
INTRODUCTION
Step 1 - Check Equipment
A09450
Fig. 2 - 48EZ-A24-36Unit Dimensions
48EZ --A
A09451
Fig. 3 - 48EZ-A42-60Unit Dimensions
48EZ --A
B C G H F A E D
Fig. 4 - Roof Curb Dimensions
SMALL CURB
ROOF CURB DETAIL
Step 4 - Provide Clearances
Step 3 - Field Fabricate Ductwork
Step 5 - Rig and Place Unit
Inspection
Step 8 - Install Gas Piping
Step 7 - Install Flue Hood
Step 6 - Connect Condensate Drain
Rigging/Lifting of Unit See Fig.
48EZ --A
FIRE OR EXPLOSION HAZARD
Fig. 7 - Sediment Trap
Configuring Units for Downflow Vertical Discharge
Step 9 - Install Duct Connections
Fig. 8 - Supply and Return Duct Opening
ELECTRICAL SHOCK HAZARD
48EZ --A
Table 1 - Physical Data - Unit 48EZ-A
Table 2 - Maximum Gas Flow Capacity
Table 1 - Physical Data - Unit 48EZ-ACont’d
Table 3 - Heating Inputs
48EZ --A
Special Procedures for 208-VOperation
Step 10 - Install Electrical Connections
High-VoltageConnections
UNIT COMPONENT DAMAGE HAZARD
PRE-START-UP
Balance Point Setting-Thermidistator Hybrid
Control Voltage Connections
Thermostat
START-UP
Step 3 - Start-upHeating and Make Adjust- ments
Step 1 - Check for Refrigerant Leaks
Step 2 - Unit Sequence of Operation
Fig. 11 - Burner Assembly
Adjust Gas Input
Check Gas Input
Table 4 - Altitude Derate Multiplier for U.S.A
Airflow and Temperature Rise
Step 4 - Start-upCooling and Make Adjust- ments
Limit Switches
Rollout Switch
Indoor Airflow and Airflow Adjustments
Checking and Adjusting Refrigerant Charge
Gas Heating Fan Speed Set-up
UNIT OPERATION HAZARD
Table 6 - Color Coding for Indoor Fan Motor Leads
Continuous Fan Operation
Fig. 13 - Interface Fan Board IFB
48EZ --A
48EZ--A
Heating Rise
48EZ--A
1234
48EZ--A
1295
48EZ--A
1402
48EZ--A
1402
48EZ--A
UNIT
48EZ--A
UNIT
48EZ--A
A10207C
48EZ A
A10207L
48EZ A
A10208C
48EZ A
A10208L
48EZ A
A08019
Fig. 16 - Cooling Charging Table-Subcooling
48EZ --A
Cleaning the Blower Motor and Wheel
MAINTENANCE
Air Filter
Indoor Blower and Motor
Induced Draft combustion air Blower Assembly
Limit Switch
Fig. 17 - Blower Housing and Flue Collector Box
Fig. 18 - Unit Access Panels
Outdoor Fan
Electrical Controls and Wiring
Refrigerant Circuit
Fig. 19 - Removal of Motor and Blower Wheel
Page
Fig. 24 - Refrigerant Circuit
High-PressureSwitch
Copeland Scroll Compressor Puron Refrigerant
EXPLOSION HAZARD
Refrigerant System
UNIT OPERATION AND SAFETY HAZARD
Compressor Oil
48EZ --A
START-UPCHECKLIST
TROUBLESHOOTING
Synthetic Roof Precautionary Procedure
Liquid Line Filter Drier
48EZ --A
SYMPTOM
48EZ --A
Table 13 - Troubleshooting Guide-Heating
Table 14 - Troubleshooting Guide-LEDError Codes
Remove and Store in Job Files
TEMPERATURES
I. PRELIMINARY INFORMATION MODEL NO
PRESSURES