Carrier 50VT-A Remove and Store in Job Files, I. Preliminary Information Model No, Temperatures

Models: 50VT-A

1 32
Download 32 pages 10.64 Kb
Page 31
Image 31
(Remove and Store in Job Files)

START-UP CHECKLIST

(Remove and Store in Job Files)

I. PRELIMINARY INFORMATION MODEL NO.:

SERIAL NO.:

DATE:

TECHNICIAN:

II. PRESTART-UP (Insert check mark in box as each item is completed)

( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS

( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE

( ) VERIFY THAT UNIT INSTALLATION IS LEVEL

( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

III.START-UP ELECTRICAL SUPPLY VOLTAGE COMPRESSOR AMPS

INDOOR (EVAPORATOR) FAN AMPS

TEMPERATURES

OUTDOOR (CONDENSER) AIR TEMPERATURE

 

 

 

 

DB

 

RETURN-AIR TEMPERATURE

 

 

 

 

 

 

DB

WB

COOLING SUPPLY AIR

 

 

DB

 

 

 

 

 

 

WB

 

HEAT PUMP SUPPLY AIR _____________________

 

ELECTRIC HEAT SUPPLY AIR _____________

 

 

 

 

 

 

 

PRESSURES

 

 

 

 

 

 

 

 

 

 

 

REFRIGERANT SUCTION

 

 

 

PSIG, SUCTION LINE TEMP*

 

REFRIGERANT DISCHARGE

 

 

 

 

 

 

PSIG, LIQUID TEMP{

 

( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS

* Measured at suction inlet to compressor

{Measured at liquid line leaving condenser.

50VT-- A

31

Page 31
Image 31
Carrier 50VT-A Remove and Store in Job Files, I. Preliminary Information Model No, Temperatures, Pressures, 50VT--A