Manuals
/
Carrier
/
Household Appliance
/
Heat Pump
Carrier
50VT-A installation instructions Cont. - Ladder Wiring Diagram, 50VT--A
Models:
50VT-A
1
16
32
32
Download
32 pages
10.64 Kb
13
14
15
16
17
18
19
20
<
>
Troubleshooting
Install
Connection Wiring Diagram
Unit Placement On Common Curb
Dimension
Maintenance
Configuring Units For Downflow Vertical Discharge
Electrical Controls and Wiring
Special Procedures for 208-VOperation
Start-UpAdjustments
Page 16
Image 16
50VT--
A
A10195
Fig. 14 Cont. - Ladder Wiring Diagram
460-3-60
16
Page 15
Page 17
Page 16
Image 16
Page 15
Page 17
Contents
TABLE OF CONTENTS
SAFETY CONSIDERATIONS
Fig. 1 - Unit 50VT-A
Installation Instructions
RECEIVING AND INSTALLATION
Installation on older “G” series roof curbs
INTRODUCTION
Step 1 - Check Equipment
50VT--A
Fig. 2 - 50VT-A24-30Unit Dimensions
A09410
50VT--A
Fig. 3 - 50VT-A36-60Unit Dimensions
A09411
Fig. 4 - Roof Curb Dimensions
LARGE CURB
UNIT PLACEMENT ON COMMON CURB
50VT--A
Fig. 5 - Rigging Weights
Step 4 - Rig and Place Unit
Inspection
Rigging/Lifting of Unit See Fig
Step 5 - Select and Install Ductwork
CONFIGURING UNITS FOR DOWNFLOW VERTICAL DISCHARGE
PERSONAL INJURY HAZARD
Fig. 6 - Supply and Return Duct Opening
Step 7 - Install Electrical Connections
High-VoltageConnections
Step 6 - Provide for Condensate Disposal
Fig. 7 - Unit Leveling Tolerances
Special Procedures for 208-VOperation
Control Voltage Connections
Accessory Electric Heaters Installation
Standard Connections
Fig. 11 - Typical Installation
Table 1 - Physical Data - Unit 50VT-A
INDOOR THERMOSTAT RETURN AIR FROM POWER SOURCE
50VT--A
50VT--A
A11002
50VT--A
A11001
50VT A
A11006
50VT--A
A11005
50VT--A
Fig. 14 - Connection Wiring Diagram
A10195
Fig. 14 Cont. - Ladder Wiring Diagram
50VT--A
Step 2 - Start-UpAdjustments
START-UP
Step 1 - Check for Refrigerant Leaks
Checking Cooling and Heating Control Operation
Checking and Adjusting Refrigerant Charge
Indoor Airflow and Airflow Adjustments
UNIT OPERATION HAZARD
50VT--A
HPS - High Pressure Switch
LCS – Loss of Charge Switch
Continuous Fan Operation
AccuraterMetering De vice
Step 3 - Defrost Control
Quiet Shift
Defrost
Fig. 16 - Interface Fan Board IFB
50VT--A
Unit
Small Cabinet
Electric Heat Pressure Drop Table in. W.C
Large Cabinet
50VT--A
MAINTENANCE
Step 1 - Air Filter
Indoor Blower and Motor
PERSONAL INJURY AND UNIT DAMAGE HAZARD
50VT--A
Fig. 18 - Cooling Charging Table-Subcooling
A09412
Page
Step 4 - Electrical Controls and Wiring
Fig. 21 - Unit Access Panels
Step 3 - Outdoor Fan
Step 5 - Refrigerant Circuit
Step 8 - Pressure Switches
Step 9 - Loss of Charge Switch
Step 10 - High-PressureSwitch
Synthetic Roof Precautionary Procedure
TROUBLESHOOTING
START-UPCHECKLIST
Loss of Charge Switch
Step 13 - System Information
PURONR R-410AQUICK REFERENCE GUIDE
50VT--A
Table 10 - Troubleshooting Chart
50VT--A
TEMPERATURES
Remove and Store in Job Files
I. PRELIMINARY INFORMATION MODEL NO
PRESSURES
50VT--A
Catalog No 50VT---09SI
Edition Date 01/11
Replaces 50VT---08SI