Carrier 58ZAV operating instructions ÐFloor and Plenum Opening Dimensions, ÐOpening Dimensions In

Models: 58ZAV

1 20
Download 20 pages 25.91 Kb
Page 7
Image 7
Fig. 5ÐFloor and Plenum Opening Dimensions

 

A

 

PLENUM

 

OPENING

B

D

 

FLOOR

 

OPENING

 

C

 

 

 

 

 

 

A96283

 

Fig. 5ÐFloor and Plenum Opening Dimensions

 

 

 

 

Table 3ÐOpening Dimensions (In.)

 

 

 

 

 

 

 

 

 

FURNACE

 

PLENUM OPENING

FLOOR OPENING

CASING

APPLICATION

 

 

 

 

 

A

 

B

C

D

WIDTH

 

 

 

Non-Combustible Flooring

12-11/16

 

19

13-3/8

19-5/8

 

 

 

 

 

 

 

14-3/16

Combustible Flooring Using KGASB Subbase

11-13/16

 

19

13-7/16

20-3/8

 

 

 

 

 

 

Combustible Flooring with CD5 or CK5 Coil Assembly or

12-5/16

 

19

13-5/16

20

 

 

 

KCAKC Coil Box

 

 

 

 

 

 

 

 

Non-Combustible Flooring

16

 

19

16-5/8

19-5/8

17-1/2

Combustible Flooring Using KGASB Subbase

15-1/8

 

19

16-3/4

20-3/8

Combustible Flooring with CD5 or CK5 Coil Assembly or

15-1/2

 

19

16-1/2

20

 

 

 

KCAKC Coil Box

 

 

 

 

 

 

 

 

Non-Combustible Flooring

19-1/2

 

19

20-1/8

19-5/8

21

Combustible Flooring Using KGASB Subbase

18-5/8

 

19

20-1/4

20-3/8

Combustible Flooring with CD5 or CK5 Coil Assembly or

19

 

19

20

20

 

 

 

KCAKC Coil Box

 

 

 

 

 

 

 

 

Non-Combustible Flooring

23

 

19

23-5/8

19-5/8

24-1/2

Combustible Flooring Using KGASB Subbase

22-1/8

 

19

23-3/4

20-3/8

Combustible Flooring with CD5 or CK5 Coil Assembly or

22-1/2

 

19

23-1/2

20

 

 

 

KCAKC Coil Box

 

 

 

 

 

 

 

to attach any portion of return-air duct. Bypass humidifier connec- tions should be made at ductwork or coil casing sides exterior to furnace.

Step 5ÐDownflow Installation

NOTE: This furnace is approved for use on combustible materials or wood flooring. A factory accessory floor base, as listed on the furnace rating plate, MUST be used. A factory accessory floor base is not required when this furnace is installed on manufactur- er's Coil Assembly Part No. CD5 or CK5, or Coil Box Part No. KCAKC is used.

1.Determine application being installed from Table 3.

2.Construct hole in floor per dimensions specified in Table 3 and Fig. 5.

3.Construct plenum to dimensions specified in Table 3.

4.If downflow subbase (KGASB) is used, install as shown in Fig. 6.

If coil assembly CD5, CK5, or Coil Box KCAKC is used, install as shown in Fig. 7.

Step 6ÐHorizontal Attic Installation

Do not install the furnace on its back; safety control operation will be adversely affected. Never connect return-air ducts to the sides or back of the furnace. Failure to follow this warning could result in fire, personal injury, or death.

The furnace can be installed horizontally on either the left-hand (LH) or right-hand (RH) side. A typical attic installation is shown in Fig. 8.

CONSTRUCT A WORKING PLATFORM

Construct working platform on location where all required furnace clearances are met. (See Fig. 2 and 8.)

7

Page 7
Image 7
Carrier 58ZAV operating instructions ÐFloor and Plenum Opening Dimensions, ÐOpening Dimensions In, ÐDownflow Installation