CFM UVHB26 warranty INSTAllATION

Models: UVHB26

1 20
Download 20 pages 9.71 Kb
Page 6
Image 6

PYROMASTER@ UVHB26 Vent-Free Heaters

INSTAllATION

0 1. PREPARING THE UVHB26

To be sure that each step of the heater installation is in order, use the check-off boxes provided.

The UVHB26 may only be used with the approved mantel and hearth assembly.

1.After determining a location, open the mantel

hearth base carton and place into position on a solid surface. NOTE: Be sure to level the base

before setting the UVHB26 heater in place.

2.Place the heater on the hearth base centering side to side and 3/4" from the back edge of the hearth base (See Fig. 1.)

3.Bend the lower mounting tabs down against the hearth base and secure with two (2) wood screws (See Fig. 1.)

v

r;?' '

r;?" ~~

BRASS TRIM

(SIDES)

Fig. 3. Insulating brass trim.

, ,.,5).:')

, ,.,5)

FP731

0 2. INSTALLING BRASS TRIM

1.Remove brass trim (3 pieces) from carton and remove the protective coating from each piece.

2.Using the provides (2) screws attached the side pieces to the heater (See Fig.3.)

3.Mount the top trim to the heater and be sure to overlap top trim to the front side of the side trim

pieces..

..~.)

')

6

Page 6
Image 6
CFM UVHB26 warranty INSTAllATION