Installation Step 2

Install the Header Bracket

You can attach the header bracket either to the wall above the garage door, or to the ceiling. Follow the instructions which will work best for your particular requirements.

Fastening the Header Bracket to the Wall

Center the bracket on the vertical guideline with the bottom edge of the bracket on the horizontal line as shown (with the arrow pointing toward the ceiling).

Mark either set of bracket holes (do not use the holes designated for ceiling mount). Drill 3/16" pilot holes and fasten the bracket securely to a structural support with the hardware provided.

Fastening the Header Bracket to the Ceiling

Extend the vertical guideline onto the ceiling as shown.

Center the bracket on the vertical mark, no more than 6" from the wall. Make sure the arrow is pointing toward the wall. The bracket can be mounted flush against the ceiling when clearance is minimal.

Mark holes designated for ceiling mount only. Drill 3/16" pilot holes and fasten bracket securely to a structural support with the hardware provided.

Wall

Mounting Holes

Ceiling Mounting Holes

CEILING MOUNT ONLY

UP

Optional

Wall Mounting

Holes

The nail hole is for

positioning only. You must use lag screws

to mount the header bracket.

The nail hole is for positioning only.

You must use lag screws to mount the header bracket.

CEILING MOUNT ONLY

UP

– Finished Ceiling –

Header

Wall

Header

Bracket

2x4

Structural

Support

ONLY MOUNT CEILING

UP

Vertical

Center Lag Screws

Line 5/16"x9x1-5/8"

Door

Spring

Header

6" Bracket

Maximum

Door

Spring

Vertical

Center Line

UP

Lag Screws 5/16"x9x1-5/8"

Highest

Point of Travel

(of Garage Door)

Garage

Door

Vertical

Center

Line

Header

VerticalWall

Center Line

Garage

Door

Hardware Shown Actual Size

Lag Screw 5/16"-9x1-5/8"

14