Manuals
/
Brands
/
Baby
/
Safety Gate
/
Chamberlain
/
Baby
/
Safety Gate
Chamberlain
SL 1000-X3
Figure 24. Exploded View
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
44
Download
44 pages, 4.44 Mb
33
34
35
36
37
38
39
40
41
42
43
44
Figure 24. Exploded View
Rev J
Doc
01-20098
Page 39 of 44
Contents
E STAT E SERIES
MODEL SL
MODEL SL 1000-X3IS FOR VEHICULAR PASSAGE GATES
ONLY, NOT INTENDED FOR PEDESTRIAN PASSAGE GATE USE
3 YEAR WARRANTY
TABLE OF CONTENTS
The LiftMaster Gate Operator Model SL
SAFETY SUMMARY
BASIC INSTALLATION HINTS AND RULES
SITE PREPARATION
A. LOCATION AND LAYOUT
Figure 1. Front Drive
Figure 2. Rear Drive
Figure 3. Mid Drive
B. PAD AND MOUNT
Figure 4. Pad and Track Ribbon
Figure 5. Bolt Down Pattern
Figure 6. Conduit Entrance Areas
C.POWER WIRING
D.LOOP DETECTORS AND PHOTO-SENSORS
E.TELEPHONE CONNECTION
F. OTHER CONNECTIONS
G. MASTER/SLAVE INTERCONNECTION (MASTER/SLAVE SYSTEM ONLY)
PART
SYSTEM INSTALLATION
A. GATE AND PHOTO-SENSORLAYOUT
B. MOUNTING GATE OPERATOR
2.Installing Chain and Anchors (Front Drive Gate Installation)
Figure 10-A.Anchor and Chain Connector
Figure 10-B.Parallel Chain Location
NOTE: For rear and mid drive installations, see Figures 2 and
C. QUICK DISCONNECT OPERATION
D. CONNECTING POWER
CAUTION
Figure 11. AC Wiring
E. RUNNING INPUT WIRING
F. SETTING GATE OPEN DIRECTION SWITCHES S2 AND S3
G.POWER UP PROCEDURE
H. USING MANUAL CONTROLS
IMPORTANT NOTE
I.SETTING LIMIT CAMS
J. GATE SENSITIVITY ADJUSTMENTS
"OPEN TO LEFT" ADJUSTMENT PROCEDURES
Left Gate Motion Adjustment (R160)
Right Gate Motion Adjustment (R69)
START-UPCurrent Adjustment (R203)
K. BASIC GATE OPERATOR PROGRAMMING
To access
To program
To exit
Step
L. CONNECTING INPUT WIRING
M.POST INSTALLATION PROCEDURES
5. Entry inputs
6. Alternate Action
7. Reclose Timer (RT)
8. Inside Interrupt Loop and Anti-Tailgating(ATG) When Exiting
GATE TYPE is SLIDE
Figure 17. Photo-SensorCoverage Areas
9. Photo-Sensors(Secondary Obstruction Sensing per UL 325)
Coverage Area A (Inside-OpenCoverage):
Coverage Area B (Inside-ClosedCoverage):
Coverage Area C (Outside-ClosedCoverage):
N. FINAL ASSEMBLY OF GATE OPERATOR
Figure 18. Gate Operator Final Assembly
IMPORTANT SAFETY PROCEDURE
2.Make sure that gate operator unit power switch is turned on
WARNING
Page
TROUBLESHOOTING AND MAINTENANCE
A. TROUBLESHOOTING
Page
13.GATE DOES NOT CLOSE AUTOMATICALLY
14.ALTERNATE ACTION DOES NOT WORK
15.GATE DOES NOT OPEN TO THE CORRECT DIRECTION
16.THERE IS SLACK OR PLAY IN THE GATE
17.ATG (ANTI-TAILGATE)DOES NOT WORK
B. FAULT LIST
C.FAULTS AND THEIR CAUSES
4.IF STUCK-LIMITLED IS TURNED ON
5.IF MAX RUN TIME LED IS TURNED ON
D. MAINTENANCE
2. PREVENTIVE MAINTENANCE INSTRUCTIONS
Figure 23. Gate Operator Disassembly and Assembly
Gate Operator Serial Number:
UPS: Yes
1.Turn off power to the gate operator at the circuit breaker
MAINTENANCE SCHEDULE TABLE
Date
Gate
Chain
Sprocket
APPENDIX A
SYSTEM OPERATION REFERENCE
FUNCTIONAL INPUTS
MANUAL INPUTS: OPEN, CLOSE, AND STOP (TB2)
Continuous activation holds
gate open
gate closed
INSIDE/OUTSIDE INTERRUPT LOOP DETECTOR (TB16)
SWING
LINEAR
SLIDE
BARRIER
OBSTRUCTION ALARM (TB17)
LOW BATTERY/ NO AC POWER (TB18)
24VAC OUTPUT (TB7)
MAGLOCK INPUT (TB4)
SLAVE I/O INPUT (TB1)
APPENDIX B: SL 1000-X3PARTS LIST
Figure 24. Exploded View
GLOSSARY
FCC REQUIREMENTS
NOTICE TO CANADIAN USERS
OPERATOR NOTES
FOR TECHNICAL SUPPORT OR TO ORDER REPLACEMENT PARTS, CALL OUR TOLL FREE NUMBER: