2. PREVENTIVE MAINTENANCE INSTRUCTIONS
Gate Operator | Gate Operator |
Cover (in place) | |
Clear Plastic | Cover |
Cover |
|
Control
CoverBox Mounting
Bolt
(4 places)
Figure 23. Gate Operator Disassembly and Assembly.Gate Operator Serial Number: | UPS: Yes | No |
•Refer to Figure 23 to perform the following.
1.Turn off power to the gate operator at the circuit breaker.2.Remove the cover mounting bolts and remove the gate operator cover.
3.Perform preventive maintenance tasks 3 to 14, above.
4.After completing all checks, perform the procedure found in Part 2, System
Installation, Paragraph M, Post Installation Procedures.
Rev J | Doc | Page 32 of 44 |