Installation Instructions | PLP Series |
PLP INSTALLATION (Cont’d)
Mount the PLP
To mount the PLP, do the following:
1.Holding the PLP against the wall, select the pair of mounting holes that best suits your situation (see Figures 5, 6, and 7).
NOTE: The mounting holes are slotted to allow for a small degree of lateral movement. The mount can be centered, or shifted to the left of center, or right of center depending on stud location.
2.Depending on your situation, install the lag bolts and washers into the pilot holes previously drilled, as described below.
Option A. Install four 5/16” x
OR
Option B. Install four 5/16” x
OR
Option C. Install four 5/16” x
OR
Option D. Install four 5/16” x
3.Tighten all lag bolts.
Option A
Figure 5. Mounting Holes – 16” Apart on Center
(Option A)
Option B
Option C
Figure 6. Mounting Holes – 16" Apart on Center
(Options B and C)
Option D
Figure 7. Mounting Holes – 24" Apart On Center
(Option D)
6