Cisco Systems 12012 manual Installing the System Grounding, Replacing the Power Supplies

Models: 12012

1 34
Download 34 pages 61.86 Kb
Page 28
Image 28
Installing the System Grounding

Removing and Replacing a Card Cage Assembly

Installing the System Grounding

Your system might have two system grounding cable lugs. The system grounding receptacles are located on the card cage assembly side flanges between the air filter tray and the power supply bay. (Refer to Figure 12.)

Perform the following steps to install the system grounding lugs to the card cage assembly:

Step 1 Position the system ground lug over the card cage assembly system grounding receptacle.

Step 2 Secure the system grounding lug to the receptacle with two sets of screws, washers, and nuts. (Refer to Figure 13.)

Repeat Step 1 and Step 2 for a second system grounding connection.

Replacing the Power Supplies

This section provides procedures for replacing an AC-input power supply and a DC-input power supply. Select the procedure appropriate for your system.

Caution Always wear an antistatic wrist strap to prevent ESD when removing and replacing a power supply.

Replacing an AC-Input Power Supply

Perform the following steps to replace an AC-input power supply:

Step 1 Attach an antistatic wrist strap to yourself and to one of the two ESD connection sockets located on the front edges of the upper card cage or to bare metal on the frame.

Step 2 Verify that the power switch on the power supply is in the STANDBY position.

Caution To prevent damaging the power supply backplane connector, do not use excessive force when installing a power supply into the bay.

Note The power supply bay positions are designated A1, A2, B1, and B2, from left to right. Install power supplies in the bay in the following order: A1, B1, A2, and B2. Any power supply bay position that does not have a power supply installed must have a power supply blank installed to maintain airflow and for EMI considerations.

28Cisco 12012 Gigabit Switch Router Card Cage Assembly Replacement Instructions

Page 28
Image 28
Cisco Systems 12012 Installing the System Grounding, Replacing the Power Supplies, Replacing an AC-Input Power Supply