Site Preparation Checklist
TableG-1 Site Planning Checklist
Task No. Planning Activity Verified By Time Date
1 Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
2 Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Air flow
3 Power evaluatio n:
Input power type
Power receptacles1
Receptacle proximity to the
equipment
Dedicated circuit for power supply
Dedicated (separate) circuits for
redundant power supplies
UPS2 for power failures
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
4 Grounding evaluation:
Circuit breaker size
CO ground (AC-powered systems)
5 Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6EMI
3 evaluation:
Distance limitations for signaling
Site wiring
RFI4 levels