Front Panel LED Status Indicator Functions
Front Panel LED Status Indicator Functions
Initial Power Up, Calibration, and Registration
The following chart illustrates the sequence of steps and the corresponding appearance of the cable modem front panel LED status indicators during
Note: After the cable modem completes step 8 (Registration Complete), the modem proceeds immediately to step 9, Normal Operations. See the table in Normal Operations (on page 33).
Front Panel LED Status Indicators During Initial
Step | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
|
|
|
|
|
|
|
|
|
|
Front Panel | Power | Self | Downstream | Downstream | Ranging | Requesting | Registering | Registration | |
Indicator | Up | Test | Scan | Signal Lock |
| IP Address |
| Complete | |
1 | POWER | On | On | On | On | On | On | On | On |
|
|
|
|
|
|
|
|
|
|
2 | DS | Blinks | On | Blinks | On | On | On | On | On |
|
|
| 1 sec |
|
|
|
|
|
|
3 | US | Blinks | On | Off | Off | Blinks | On | On | On |
|
|
| 1 sec |
|
|
|
|
|
|
4 | ONLINE | Blinks | On | Off | Off | Off | Off | Blinks | On |
|
|
| 1 sec |
|
|
|
|
|
|
5 | LINK | Off | On | Off - When no devices are connected to the Ethernet or USB ports | On | ||||
|
|
| 1 sec | On - When devices are connected to the Ethernet or USB ports |
|
| |||
|
|
|
| Blinks - When data activity is present |
|
|
|
32 | 4030802 Rev A |