Prepare for Workbench or Tabletop Installation
For a workbench or tabletop installation, verify the following before installing the router:
•The router is off the floor and has adequate ventilation.
•An adequate chassis ground (earth) connection exists for the router.
•The router has at last 3 inches (7.62 cm) of clearance at the inlet and exhaust vents (sides of router).
•The router has 19 inches (48.3 cm) clearance at the front and rear to allow for CompactFlash Disk, SFP Gigabit Interface
Converter (GBIC) module, and port adapter replacement or installation, or to access cables or equipment.
•The port adapter filler panel is installed if a port adapter is not installed. The slot must not be empty.
For cable-management bracket installation instructions, see page 9.
Prepare for Rack-Mount Installation
Before you begin the rack-mounting tasks, decide whether or not you want to front- or rear-mount the chassis, decide whether
or not you want to attach the cable-management bracket, and determine the type of rack—four-post or two-post—that you will
be using.
3 Install External Options
This section provides installation instructions for the Gigabit Ethernet SFP Gigabit Interface Converter (GBIC) module. It does
not ship installed.
Figure 1 Cisco 7301 Front Panel
1Port adapter 9Auxiliary port
2Port adapter latch 10 Console port
3RJ-45 port GE 0/0 11 CompactFlash Disk ejector button
4Gigabit Ethernet SFP GBIC port 0/0 12 Ground for ESD wrist strap with banana jack
5RJ-45 port GE 0/1 13 Alarm port
6Gigabit Ethernet SFP GBIC port 0/1 14 Power switch
7RJ-45 port GE 0/2 15 CompactFlash Disk slot
8Gigabit Ethernet SFP GBIC port 0/2 16 Power connector
ALARM
RJ45 ENLINK
TX RX
GBIC
GIGABIT ETHERNET 0/2
RJ45 ENLINK
TXR
X
GBIC
GIGABIT ETHERNET 0/0
RJ45 ENLINK
TXRX
GBIC
GIGABIT ETHERNET 0/1
CISCO 7301
SLOT 1
CONSOLE
AUX
COMP
ACT
FLASHST
A
TUS
100-240V
, 2A, 50/60 Hz
24V
=
9A, 48 - 60V
=
5A
ENABLED
RX CELLS
RX CARRIER
RX ALARM
ATM
80265
12
1
357
14
2
468
15
11 13
910
BA