Appendix A Site Planning Guidelines
Preliminary Site Survey
Table | Sample Routing System Preliminary Site Survey (continued) |
Preliminary Site Survey
Secondary Contact
Name and title:
Phone number:
Mobile phone number:
Fax number:
Pager number:
Delivery and Installation Constraints
Is there a loading dock available to unload the equipment at this site?
Is someone on site during working hours to accept delivery of the materials? If not, list the times this person is available.
Are there any special requirements for equipment delivery (for example, special delivery times, the need for escorts or IDs, or safety procedures to follow, such as hard hats, safety glasses, and so on)?
Is the path to the installation area clear? If not, can arrangements be made to move the equipment to the installation area? Describe them.
What floor is the installation site on?
If it is on a floor other than the ground floor, is there a freight elevator available? Note whether the equipment needs to be brought up a flight of stairs.
Equipment Rack Mounting
How many chassis are being installed?
Are there equipment racks currently available for all chassis to be installed?
Do the equipment racks meet the installation requirements?
Make a sketch of the area where the chassis will be installed. Determine how many chassis (1 or 2) will be installed in each equipment rack.