Appendix A Site Planning Guidelines

Preliminary Site Survey

Table A-2

Sample Routing System Preliminary Site Survey (continued)

Preliminary Site Survey

Supported Data Interfaces

Will the routing system be connected to OC-48/STM-16 POS circuits? How many ports?

Will the routing system be connected to OC-192/STM-64 POS circuits? How many ports?

Will the routing system be connected to OC-768/STM-256 POS circuits? How many ports?

Will the routing system be connected to 10-Gigabit Ethernet (GE) circuits? How many ports?

Cable Management

Have the cables been pulled for the data interfaces? If not, list the outstanding cabling that needs to be installed and the scheduled completion dates.

Are there connection points on the fiber distribution panel for all optical cables connecting to the routing system?

Who will provide fiber jumpers? What length of fiber jumper is required to complete the installation?

What type of fiber connector is used at the installation site?

If attenuation is required, are attenuators available at the installation site? If not, who will pay for the attenuators?

Cisco CRS-1 Carrier Routing System 8-Slot Line Card Chassis Site Planning Guide

 

OL-5802-06

A-5

 