Chapter 2 Installation
Preparing for Installation
Caution Periodically check the resistance value of the antistatic strap, which should be between 1 and 10 megohms (Mohms).
Unpacking the Box
Table
Table
•Power cord (black)
•Desktop power supply
•Console cable,
•Two Ethernet cables (yellow)
•Product documentation
To prepare for installation, follow these steps:
Step 1 Obtain a broadband or Ethernet connection from your service provider.
Step 2 Remove the yellow Ethernet cables, light blue console cable, and product documentation from the Open Me First bag. Remove the desktop power supply and the black power cord from the accessory kit. Gather the Ethernet devices to be connected to the router: hub, servers, workstations, or PCs.
Step 3 If you plan to configure the software using IOS commands via the console port, provide a terminal or PC to connect to the console port.
Step 4 If you plan to use the
| Cisco 806 Router and SOHO 71 Router Hardware Installation Guide |