10.Place level along inside carriage rail at C and raise or lower either end of press as necessary. Turn leveling bolts equal amounts to maintain alignment at A and B.

11.Use a level to recheck A, B, and C.

12.Turn two center leveling bolts until they just touch the floor.

13.Tighten leveling bolt jam nuts and bolt press to floor.

14.Use a level to recheck A, B and C.

15.Install two 5/8" washers on each of the 5/8"-11 Grade 5 anchoring bolts.

16.Place anchoring bolts with washers into expansion anchors.

17.Tighten all anchor bolts and torque to 80 ft./lbs.

18.Use grout if required.

Items Shipped in Box

A cardboard box is shipped inside press cabinet. It includes:

Hi-temp lubricant

Installation and Operation Manuals

Eccentric wrench

NOTE: Eccentric wrench will be used later for adjusting buck carriage roller throughout life of press. Keep hi-temp lubricant for maintenance.

MOUNTING HOLES

(6 PLACES)

0.8125 in. (21 mm)

 

5 in.

7.75 in.

 

 

 

 

 

3 in.

 

 

(127 mm) (197 mm)

 

 

 

 

 

(76 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operation

Connecting Steam Supply and Returns

Refer to Figure 5.

NOTE: Clean out all pipe lines before connecting them to the press.

IMPORTANT: Failure to properly install suitable traps and check valves and supply correct steam pressure will reduce operating efficiency.

Steam supply connected to press must have a constant minimum pressure of 110 psi (7.58 bar).

The following steps outline the procedure for connecting steam supply and return lines to press.

1.Run a 1-1/4 inch NPT steam line to the steam supply connection with suitable black iron pipe, elbows, strainer, ball valve and union.

IMPORTANT: A minimum 3 inch (7.62 cm) riser should be installed off the supply header to minimize water in the steam supply to the press.

NOTE: It is recommended that a steam strainer be installed between the steam supply and press.

2.Install three suitable 1/2 inch NPT steam traps, unions, check valves and ball valve between steam return connections and steam return lines.

NOTE: Cast iron inverted bucket traps are recommended. Size traps according to steam pressure and consumption found in Utility Specifications.

UNION

AIR SUPPLY

(0.25 in. NPT)

 

STEAM

 

STRAINER

 

 

3 in. MIN.

12.25 in.

28 in.

(711 mm)

(311 mm)

17.75 in.

 

 

 

 

 

 

 

65.25 in.

 

 

 

 

 

 

(451 mm)

 

 

 

 

 

(1657 mm)

 

 

 

 

102 in.

 

 

BASE PADS

 

(2591 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOUNTING HOLES

CAB412N

Figure 4

RISER

HEADER

STEAM LINE

(1.25 in. NPT)

STEAM TRAP

CHECK VALVE

BALL VALVE

UNION

REQUIRED PIPING

HOOKUP BY CUSTOMER

CAB413N

Figure 5

AJ0976

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

11