Operation

Connecting Air Service

Air service connected to press must have a minimum constant pressure of 75 psi (5.17 bar) and be of ample volume to meet requirements listed in Utility Specifications section. Air pressure should be reduced to 65 psi (4.48 bar) at air inlet regulator. It is the responsibility of the customer to connect the air line with galvanized pipe, brass, aluminum or stainless steel pipe, copper tubing, fittings, shut-off valve, union, air filter and air dryer suitable for delivery of clean, dry air to the inlet.

IMPORTANT: Failure to provide clean, dry air to press will cause premature valve failure, unnecessary downtime and void warranty.

NOTE: A shut-off valve and union placed at each unit is recommended.

Connecting Electrical Service

WARNING

To avoid possible serious injury or death:

ALWAYS shut off AND lock out ALL electrical power to press BEFORE performing electrical work.

W368

IMPORTANT: Improper connections will result in equipment damage and will void the warranty.

1.Install a suitably sized fused disconnect switch or circuit breaker as close to press as practical.

2.Remove one knockout plug from electrical connection box.

3.Connect proper size conduit encased wires to wires inside box.

4.Connect conduit to box.

NOTE: Refer to wiring schematic enclosed in control panel for further details and instructions.

12

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

AJ0976