8 Hour Time Weighted Average (OSHA Method)
1.5 % 750,000cf | Hours Operation | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
TWA (OSHA Method) | 0 change/hr | 5 | 14 | 27 | 46 | 69 | 96 | 128 | 164 |
| 1/2 change/hr | 4 | 9 | 16 | 24 | 33 | 42 | 50 | 59 |
| 1 change/hr | 3 | 7 | 11 | 16 | 20 | 25 | 29 | 34 |
| 2 change/hr | 2 | 4 | 7 | 9 | 11 | 13 | 16 | 18 |
Based on the CO production rates shown above the TWAwould not be exceeded in a
100 x 750 x 10 foot (empty) space after 8 hours with 2 air changes per hour. (Assumes no additional CO exposure during 8 hour time period)
MaintenanceofEquipment
Warning: The proper maintenance of equipment is vital to safe operation. LPG engines are dependent on engine tune up, and air filter replacement. CO concentration (production) skyrockets when the air to fuel ratio becomes fuel rich. Follow the recommended Maintenance Schedule for the engine found in the Engine Operator/Owner Manual as well as the Maintenance And Adjustments schedule found in the Propane Floor Equipment Operator’s Manual that were supplied with the equipment. Additional manuals may be obtained by contacting Clarke at
COSafetyEquipmentAvailable
•Envirogard automated fuel to air ratio monitoring and regulation providing an optimum combustion
•
•High cubic feet per minute (CFM) fans (forced air mixing)
•Digital combustion analyzers for tail pipe emissions monitoring