Ö Assemble Left Fryer

Hardware shown actual size

Step

17

Assembly to the Grill (continued).

(CX)

(TN)

 

(DY)

 

M6 x 20mm Screw

M6 x 15mm Screw

 

M6 Flat Washer

(2) Qty.

(2) Qty.

 

(2) Qty.

 

 

 

 

17-A

View of Grill from Rear

17-A. LOOSELY assemble two additional Screws (TN) and two Flatwashers (DY) through the Firebox into the Left Fryer Assembly at the rear of the grill.

17-B

TN (x2)

DY (x2)

17-C

17-C. Assemble two additional Screws (CS) through the Left Fryer Assembly into the Firebox at the front of the grill.

ÖTighten all fasteners.

17-D

CX (x2)

19

Page 19
Image 19
Coleman 7700 LP Gas Series, 7700 Series manual 17-A, 17-B 17-C, 17-D