Hitachi Lightning 9900™ User and Reference Guide  ix 
4.4 Open-Systems Configuration...........................................76 
4.4.1 Configuring the Fibre-Channel Ports...............................77 
4.4.2 Virtual LVI/LUN Devices.........................................77 
4.4.3 LU Size Expansion (LUSE) Devices.................................77 
4.5 Open Systems Operations .............................................78 
4.5.1 Command Tag Queuing .........................................78 
4.5.2 Host/Application Failover Support.................................78 
4.5.3 Path Failover Support ..........................................79 
4.5.4 Remote SIM (R-SIM) Reporting....................................80 
4.5.5 SNMP Remote Subsystem Management .............................80 
4.5.6 NAS and SAN Operations ........................................80 
Chapter 5 Planning for Installation and Operation 
5.1 User Responsibilities.................................................81 
5.2 Electrical Specifications and Requirements for Three-Phase Subsystems.........82 
5.2.1 Internal Cable Diagram.........................................82 
5.2.2 Power Plugs..................................................83 
5.2.3 Features.....................................................84 
5.2.4 Current Rating, Power Plug, Receptacle, and Connector for 
Three-Phase (60 Hz only)........................................84
5.2.5 Input Voltage Tolerances........................................85 
5.3 Electrical Specifications and Requirements for Single-Phase Subsystems.........86 
5.3.1 Internal Cable Diagram.........................................86 
5.3.2 Power Plugs..................................................88 
5.3.3 Features.....................................................91 
5.3.4 Current Rating, Power Plug, Receptacle, and Connector for 
Single-Phase (60 Hz only)........................................91
5.3.5 Input Voltage Tolerances........................................92 
5.4 Dimensions and Weight...............................................93 
5.5 Floor Loading and Cable Routing Requirements ............................96 
5.5.1 Service Clearance Requirements..................................96 
5.5.2 Minimum Subsystem Disk Configuration............................101 
5.5.3 Floor Load Rating.............................................105 
5.5.4 Cable Requirements...........................................109 
5.6 Channel Specifications and Requirements................................110 
5.7 Environmental Specifications and Requirements...........................111 
5.7.1 Temperature and Humidity Requirements..........................111 
5.7.2 Power Consumption and Heat Output Specifications..................111 
5.7.3 Loudness...................................................113 
5.7.4 Air Flow Requirements.........................................113 
5.7.5 Vibration and Shock Tolerances..................................114