Conair VL Series manual 3.1GENERAL, 3.2START UP/OPERATIONS PROCEDURE A.SYSTEM FILL

Models: VL Series

1 44
Download 44 pages 5.24 Kb
Page 14
Image 14
3.1GENERAL

3.1GENERAL

A.Failure to follow the factory required operation procedures may adversely affect the unit’s ability to control process temperature and may create a hazardous operating condition which may result in unit damage and serious operator injury or death.

B.The Operations segment of this manual is outlined below:

3.2Machine start-up/operations procedure - follow this segment to start the unit after the initial installation or to restart the unit after reinstallation to the same or different process. This section includes information on system fill, electric motor phasing (pump rotation) and process flow adjustments.

3.3Instrument - follow this segment to start up and operate the instrument controller. This section includes information on automatic and manual venting, setpoint selection and adjustment, and feature explanations.

3.4Shut down procedure - follow this segment to shut down the unit. This segment includes information on system cool down, shut down, electrical power supply precautions, and disconnection from system.

3.2START UP/OPERATIONS PROCEDURE

A.SYSTEM FILL

1.The unit has an internal reservoir which must be filled and maintained for proper operation.

2.Conair recommends the addition of 20% inhibited propylene glycol to the process fluid. This should help prevent the process fluid from freezing and internal components from rusting. A biocide must be added to the water to prevent organism growth in the chilled water system. See water treatment section in section 8 of this manual for more information.

3.Remove the top panel to access the reservoir. Add fluid directly to the reservoir tank. Please note, when the pump is first started, and after the process lines are filled and entrained air

is purged, additional

 

fluid may be required to

 

restore the reservoir to

Reservoir

the correct level.

 

Page: 14

VL Series Portable Chillers, 0.25 to 1.5 Tons

UGH020/0301

Page 14
Image 14
Conair VL Series manual 3.1GENERAL, 3.2START UP/OPERATIONS PROCEDURE A.SYSTEM FILL

FAQ

What should be added to the process fluid?

Conair recommends the addition of 20% inhibited propylene glycol to the process fluid to prevent freezing and rusting. A biocide must be added to the water to prevent organism growth.

How to access the reservoir for filling?

Remove the top panel to access the reservoir and add fluid directly to the tank.

What precautions should be taken during shut down?

Follow the segment for shut down procedure, including system cool down, electrical power supply precautions, and disconnection from the system.