NAILING TAB INSTALLATION
1)Attach the nailing tabs to the corner posts using the 2 sheet metal screws supplied. Secure through the
centre of the top and bottom slots in the nailing tab and then through the existing holes in the corner posts.
If there are no existing holes, follow these instructions:
Position the nailing tab so that the front face is offset with the front edge of the corner post (approx. ½"). Centre the nailing tab vertically on the corner post.
Figure 40 a.
Drill through the centre of the top and bottom slots in the nailing tab. Secure using the two sheet metal screws supplied. This allows the nailing tab to slide back and forth for desired framing. Figure 40 b.
2)To determine the final location of the nailing tab
you must first determine the thickness of your finishing material (i.e. drywall). This will determine the dimension from
the front edge of the corner post to the nailing tab. Once the nailing tab is in the desired location, drill through the centre hole of the nailing tab. Secure with a sheet metal screw*. Figure 40 c.
* Additional set screws may be installed.
CORNER | FIGURES |
POST |
|
NAILING |
|
TAB |
|
TOP SLOT |
|
A |
| B |
FINISHING
MATERIAL
19
FINISHING
LOG PLACEMENT / GLOWING EMBERS
PHAZERTM logs and glowing embers, exclusive to Continental® Fire- places, provide a unique and realistic glowing effect that is different in every installation. Take the time to carefully position the glowing embers for a maximum glowing effect. Log colours may vary. During the initial use of the fireplace, the colours will become more uniform as colour pigments burn in during the heat activated curing process.
FIGURES 41a-h
#1
1.Center the rear log (#1) behind the rear burner and onto the log support.
#3 | #2 |
|
2.Place log#2 and log#3 onto the locating pins. The logs should sit fl at on the burner.
#4
3. Place the locating hole on the underside of log#4 onto the locating pin on top of log#3. The notch at the opposite end of log#4 sits on the third grate post in from the right.
#5
CENTRE
HOLE
C