Cres Cor CCBC12-UA-100, CCBC-4-35, CCBC-12-75 Page, Check installation of shelves or pan slides

Models: CCBC12-UA-100 CCBC-12-75 CCBC-4-35

1 43
Download 43 pages 13.84 Kb
Page 14
Image 14

[ Section 2-Installation ]

[ Page 12 ]

3.Make sure cabinet is sitting level with all four (4) casters (or legs) in contact with the floor.

4.Also make sure the door stays open when opened past 90 degrees.

5.Inspect magnetic door gasket to be sure it is making contact on all four (4) sides. Also make sure it is not cut, torn, twisted or otherwise deformed.

6.Check installation of shelves or pan slides .

7.Check electrical power source for correct voltage, phase and ampacity. Refer to cabinet data plate for requirements.

8.Remove electrical control box cover and check all wiring connections for a secure hold. On rare occasions, rough shipping and handling conditions can result in loosening of connections resulting in electrical problems.

9.Make sure all miniature circuit breakers are turned on.

10.Check all fan blades. They should turn freely without touching anything as they spin.

11.Check electrical power supply cord and plug for any damage and be sure it is not routed in a way that would permit anyone to trip over it.

Page 14
Image 14
Cres Cor CCBC12-UA-100, CCBC-4-35, CCBC-12-75 service manual Page, Check installation of shelves or pan slides