CyberPower CS150U48V3 operation manual Unpacking, Prior to Installation

Models: CS150U48V3

1 18
Download 18 pages 37.02 Kb
Page 9
Image 9
4.2Unpacking

4.2Unpacking

Inspect the Battery Backup Unit upon receipt. The box should contain the following:

Battery Backup Power Supply Unit x 1

Battery Shelves x 2

Battery Tray x 2

Battery Tray Clamp x 2

M4 x 8 Truss head Screws x 8 (secure clamp to shelf)

M4 x 8 Truss head Screws x 4 (secure shelf to enclosure)

Accessory Pack

Terminal Connectors x 2

Cable Ties x 6

Battery Terminal Jumper x 6

Battery Wire Harness Assemblies x 2

User’s Manual x 1

Wall Mount Kit

Wall Mount Bracket x 2

M8 Flange Nut x 4

(OPTIONAL) Pole Mount Kit

Pole Mount Bracket x 3

M8 Flange Nut x 6

M8 x 25L Hex Head Screws (clamp center bracket to side brackets) x 4

M8 Lock Washers x 4

M8 Flat Washers x 4

(OPTIONAL) Battery Heater

Battery Heater Sheet x 1

Circuit Breaker with Outlet x 1

4.3Prior to Installation

Installation of the unit must be performed by skilled technicians and electricians familiar with electrical equipment. Do not allow unqualified personnel to handle, install, or operate the equipment. The installation must comply with both the requirements of the National Electrical Code (ANSI/NFPA 70, latest issue), and local codes.

CAUTION: When batteries are installed in the UPS, the total weight will exceed 50 pounds. Make sure the fasteners used to attach to the wall are of sufficient strength to securely hold the UPS.

© 2010 CyberPower Systems (USA), Inc. All Trademarks are property of their owners.

Page: 8 of 17

Page 9
Image 9
CyberPower CS150U48V3 operation manual Unpacking, Prior to Installation