CYRAQ™ 21

CyberResearch® Displays

2.3 Panel Mounting: CRxF/CRxR 21

Prior to performing subsequent steps, ensure the panel-mounting location (including panel thickness) is suitable for the CYRAQ 21, and meets Environmental requirements in Specifications section.

3NOTE: Panel thickness should not exceed: .55" (14.1mm) if the unit has the standard 3.2mm (1/8") Poron™ gasket installed. Suggested panel thickness is calculated based on standard CYRAQ 21 parts and dimensions, custom units may not meet these specifications. Prior to panel mounting a CYRAQ, the included gasket must be affixed to the rear of the enclosure.

2.3.1Panel-Mount Gasket Installation

IMPORTANT! Unless requested at the time of purchase, the display is shipped with gasket applied. Skip to section 2.3.2.

However, in certain instances the mounting gasket may be shipped loose to allow for increased installation flexibility in the case of custom applications. This permits customers to then choose which mounting application best suits their environment— panel- or rack-mount. Affixing the gasket to the back of the CYRAQ’s enclosure is recommended for panel mounting applications; while adhering directly to the mounting plate is recommended for rack-mount applications.

The mounting gasket is a critical component to this monitor’s NEMA 4X rating for watertightness—it must be installed correctly to meet this standard. It is also important to note that the rack-mount installation procedure differs from the panel mount procedure. Please read the instructions below carefully before installing the gasket.

1.Place the monitor face down on a flat surface with bottom of the monitor closest to you; take care not to damage or scratch the screen.

2.Arrange the gasket to match monitor orientation; align Section D with bottom of monitor’s enclosure.

3.Remove adhesive backing of Section A on gasket.

3NOTE: It’s important to focus on aligning the holes of gasket and studs on the rear of the enclosure rather than their respective edges.

4.Align center hole (in Section A) of gasket

 

with center stud on rear of monitor; take

 

 

 

 

 

 

 

 

 

 

 

A

 

care not to let other portions of the gasket

 

 

 

 

 

 

 

 

touch mounting plate until aligned

 

 

 

 

 

 

 

 

properly.

 

 

 

 

 

 

 

5.

Carefully align and place the rest of

 

B

 

 

 

C

 

 

 

 

 

 

Section A, working out from center.

 

 

 

 

 

 

 

6.

When done, firmly press down and

 

 

 

 

 

 

 

 

smooth gasket in Section A.

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

7.

Repeat process for each of the other three

 

 

 

 

 

 

 

 

 

 

 

 

sides.

 

 

 

 

 

 

 

 

 

Figure 5: Panel Mount Gasket Installation

 

 

 

16

 

©Copyright 2005 CyberResearch, Inc