DATALOGIC C-BOX 200
Installation - 9
The C-BOX 200 spring clamp connector pinouts are indicated in the followingtable.Refer to the scanner Installation Manual for details.
Pin Name
1, 3, 5 VS
2, 4, 6 GND
7, 8 EARTH GROUND
*9, 13 RS485 CABLE SHIELD
*10, 14 RS485 REF
*11, 15 RTX485+
*12, 16 RTX485-
20, 33, 34, 40 Reserved
21 OUT1+
23 OUT2+
27 EXT TRIG+
28 EXT TRIG-
35 TXA
37 RXA
39 SGND
DS2100
DS2400
DS4300
DS4600
22 OUT REF OUT1-
24 OUT REF OUT2-
25, 26 NC Reserved
29 NC IN1+
30 NC IN1-
31 NC IN2+
32 NC IN2-
36 RTSA GND
38 CTSA SGND AUX
*The signals on pins 9, 10, 11 and 12 are repeated on pins 13, 14, 15 and 16 to facilitate
network connections (i.e. Multiplexer connections using the RS485 half-duplex Interface). In
this way the network bus can enter and exit the C-BOX from different spring clamps but be
physically connected together.
NOTEPin 7 or 8 should be connected to the earth ground.Pin 17, 18 and 19 are not present in the C-BOX 200 model.