Delta 35, F-25, 30, 45, 40 warranty Primary Piping, • Install balancing valves to

Models: 45 30 35 40 F-25

1 57
Download 57 pages 26.34 Kb
Page 26
Image 26
• Install balancing valves to

Primary Piping

2

1 Manual background

2

12" max.

 

6

6

 

3

3

2

2

2

 

 

 

L

L

 

O

O

 

A

A

 

D

D

2

 

 

 

2

2

 

3

3

 

5

 

Size primary manifold for total flow of all circulators

Size each circulator to indi- vidual circuit requirements

Install balancing valves to adjust flow to distribute heat to all zones

Fig. 8: Primary piping - Zoning with Circulators

6

 

 

2

 

 

4

4

 

12" max.

 

 

1

2

 

2

• Install balancing valves to

 

 

L

L

adjust flow to distribute

heat to all zones

O

O

A

A

 

D

D

 

2

2

2

 

Manual background 5

Fig. 9: Primary Piping - Zoning with Zone Valves

1.

Appliance circulator

5. System purge valve

 

2.

Shut-off valves

6. System circulator

 

3.

Flow check valve

 

 

 

4.

Zone valve

Note: See page 20 for near appliance piping.

 

 

 

 

 

 

 

 

21

 

 

 

 

 

 

 

Page 26
Image 26
Delta 35, F-25, 30, 45, 40 warranty Primary Piping, • Install balancing valves to