Primary Piping
2
1
2
12" max.
| 6 | 6 |
| 3 | 3 |
2 | 2 | 2 |
|
| |
| L | L |
| O | O |
| A | A |
| D | D |
2 |
|
|
| 2 | 2 |
| 3 | 3 |
| 5 |
|
•Size primary manifold for total flow of all circulators
•Size each circulator to indi- vidual circuit requirements
•Install balancing valves to adjust flow to distribute heat to all zones
Fig. 8: Primary piping - Zoning with Circulators
6 |
|
| |
2 |
|
| |
4 | 4 |
| |
12" max. |
|
| |
1 | 2 |
| |
2 | • Install balancing valves to | ||
|
| ||
L | L | adjust flow to distribute | |
heat to all zones | |||
O | O | ||
A | A |
| |
D | D |
|
2 | 2 |
2 |
|
5
Fig. 9: Primary Piping - Zoning with Zone Valves
1. | Appliance circulator | 5. System purge valve |
| |
2. | 6. System circulator |
| ||
3. | Flow check valve |
|
|
|
4. | Zone valve | Note: See page 20 for near appliance piping. |
| |
|
|
|
|
|
|
| 21 |
|
|
|
|
|
|
|