Desa CGEFP33NRB, CGEFP33PRB Installation, Continued, Installing Variable Speed Blower Accessory

Models: CGEFP33NRB CGEFP33PRB

1 42
Download 42 pages 10.85 Kb
Page 11
Image 11
INSTALLING VARIABLE SPEED BLOWER ACCESSORY

INSTALLATION

Relocating Wall Switch Assembly (Cont.) Installing Variable Speed Blower Accessory

11

INSTALLATION

Continued

16.Position wall switch assembly vertically over wall openings with decal lettering upright (see Figure 13).

17.Insert mounting screws, removed in step 2 of Relocating Wall Switch Assembly on pages 9 and 10, through holes in wall plate and into wall anchors.

18.Tighten screws until wall plate is firmly attached to wall. Do not overtighten.

Opening in

Wall or

Mantel Wall

Wall Switch Assembly

Screws

Figure 13 - Securing Wall Switch Assembly

Mounting Wall Switch Assembly to Side of Mantel

13.Position wall switch assembly vertically over opening with decal lettering upright. Make sure wires freely pass through wall without binding. Align holes in wall plate with 1/8" pilot holes in mantel wall.

14.Drive mounting screws, removed in step 2 of Relocating Wall Switch Assembly on pages 9 and 10, through wall plate holes and into pilot holes in mantel wall.

15.Tighten screws until wall switch assembly is firmly attached to mantel. Do not overtighten.

INSTALLING VARIABLE SPEED BLOWER ACCESSORY

NOTICE: Shut off gas supply and disconnect heater from gas supply if installing blower into previously installed fireplace. Contact a qualified service person to do this.

1.If fireplace screen and floor are still installed, see Removing Fireplace Screen and Floor Assembly, page 8.

2.Attach the power cord to the blower motor by firmly pushing the two female terminals at the end of the power cord onto the two spade terminals on the blower motor.

3.Attach green ground wire from power cord to blower housing using screw provided (see Figure 14). Tighten screws securely.

7.Create three openings in the mantel wall according to Tem- plate 2, page 39. This is best done by making a pattern to work with on the mantel. Carefully cut page 39/40 from manual and tape paper template vertically onto mantel wall at preferred location. Pierce the paper at the centers of the 2 holes with a nail or sharp pencil, leaving a mark on the wall. Do the same at centers of the four circles near the corners of the rectangle.

8.Remove paper template from mantel wall.

9.Drill 1/8" pilot holes at each mark for top and bottom screw holes. Drill 3/8" holes at each mark for centers of four circles near corners of rectangle.

10.Using a straight edge and pencil, connect the outer edges of the 4 holes for the rectangle (see Figure 10, page 10). This will give you cutting lines for the rectangle you will cut in the mantel wall.

11.Using a keyhole saw, hack saw blade, drill, file, or other suit- able tool, carefully cut out the rectangular opening. Note: The corners of the rectangle may be round. IMPORTANT: Do not exceed the size of the rectangle on template.

12.Carefully pass wall switch assembly through rectangular open- ing from inside mantel (see Figure 13).

4.Place the blower against lower rear wall of firebox outer wrap- per with the exhaust port directed upward. Align the holes in top mounting tabs of blower with holes in wall of wrapper (see Figure 14). Using 2 screws provided, mount blower and tighten screws securely.

Blower

Lower Rear

Wall of

Manual backgroundFirebox

Screws

Exhaust

Manual backgroundPort

Manual backgroundTop

Mounting

Screw Manual background Tab

Green Ground Wire

Figure 14 - Mounting Blower to Firebox

Manual backgroundFor moreManual backgroundManual backgroundManual backgroundvisit www.Manual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

111245-01A

Page 11
Image 11
Desa CGEFP33NRB, CGEFP33PRB installation manual Installation, Continued, Installing Variable Speed Blower Accessory