Installation Items Needed

INSTALLATION

Connecting Fireplace To Gas Supply (Cont.) Checking Gas Connections

17

INSTALLATION

Continued

CONNECTING FIREPLACE TO GAS SUPPLY

Installation Items Needed

5/16" hex socket wrench or nut-driver

Phillips screwdriver

sealant (resistant to propane/LP gas, not provided)

1.If fireplace screen and floor are still installed, see Removing Fireplace Screen and Floor Assembly, page 8.

2.Route gas line (provided by installer) from equipment shutoff valve to fireplace. Route flexible gas supply line through one of the access holes.

NOTICE: Most building codes do not permit con- cealed gas connections. A flexible gas line is pro- vided to allow accessibility from the fireplace (see Figure 26). The flexible gas supply line connection to the equipment shutoff valve should be accessible.

3.Attach the flexible gas line to gas supply (see Figure 26). Check tightness of flexible gas line attached to gas regulator of fire- place (see Figure 26).

4.Check all gas connections for leaks. See Checking Gas Con- nections.

5.Replace fireplace floor assembly. Feed flexible gas line into fireplace base area while replacing fireplace floor assembly. Make sure the entire flexible gas line is in fireplace base area.

Note: Be careful of wires and components on underside of fireplace floor. Reattach fireplace floor assembly with screws removed in step 3 of Removing Fireplace Screen and Floor Assembly, page 8.

To Fireplace

Flexible Gas Line from

Gas Regulator

Fireplace Gas Regulator

 

 

 

Equipment Shutoff Valve Pressure Testing Gas Supply Piping System Provided by Installer

From Gas Meter (Natural) From External Regulator (Propane/LP)

Figure 26 - Attaching Gas Lines Together

CHECKING GAS CONNECTIONS

Manual background WARNING: Test all gas piping and connections, internal and external to unit, for leaks after installing or servicing. Correct all leaks at once.

Manual background WARNING: Never use an open flame to check for a leak. Apply a noncorrosive leak detection fluid to all joints. Bubbles forming show a leak. Correct all leaks at once.

Manual background WARNING: For propane/LP units, make sure exter- nal regulator has been installed between propane/LP supply and heater. See guidelines under Installing Gas Piping to Fireplace Location, page 15.

Pressure Testing Gas Supply Piping System

Test Pressures In Excess Of 1/2 PSIG (3.5 kPa)

1.Disconnect appliance with its appliance main gas valve (con- trol valve) and equipment shutoff valve from gas supply pip- ing system. Pressures in excess of 1/2 psig will damage fire- place gas regulator.

2.Cap off open end of gas pipe where equipment shutoff valve was connected.

3.Pressurize supply piping system by either opening propane/LP supply tank valve for propane/LP gas or opening main gas valve located on or near gas meter for natural gas, or using com- pressed air.

4.Check all joints of gas supply piping system. Apply noncorrosive leak detection fluid to all joints. Bubbles forming show a leak.

5.Correct all leaks at once.

6.Reconnect fireplace and equipment shutoff valve to gas sup- ply. Check reconnected fittings for leaks.

Test Pressures Equal To or Less Than 1/2 PSIG (3.5 kPa)

1.Close equipment shutoff valve (see Figure 27, page 18).

2.Pressurize supply piping system by either opening propane/LP supply tank valve for propane/LP gas or opening main gas valve located on or near gas meter for natural gas, or using com- pressed air.

3.Check all joints from gas meter for natural gas or propane/LP supply to equipment shutoff valve for propane/LP gas (see Fig- ures 28 or 29, page 18). Apply noncorrosive leak detection fluid to all joints. Bubbles forming show a leak.

4.Correct all leaks at once.

Manual backgroundFor moreManual backgroundManual backgroundManual backgroundvisit www.Manual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

111245-01A

Page 17
Image 17
Desa CGEFP33NRB, CGEFP33PRB Continued, Installation Items Needed, Pressure Testing Gas Supply Piping System