![](/images/new-backgrounds/1012973/1297315x1.webp)
DIRECT-VENT FIREPLACE
VENTING INSTALLATION
Continued
INSTALLATION FOR HORIZONTAL TERMINATION
1.Determine the route your horizontal venting will take. Note: The location of the horizontal vent termination on the exterior wall must meet all local and national building codes and must not be easily blocked or obstructed.
WARNING: Do not recess vent terminal into a wall or siding.
Snorkel terminations are available for terminations requiring a vertical rise on the exterior of the building (see Figures 9 and 10). Follow the same installation procedures as used for standard horizon- tal terminations. If installing the snor- kel termination below grade (basement applications), you must provide proper drainage to prevent water from entering the snorkel termination (see Figure 10). Do not back fill around the snorkel ter- mination.
2.Rigid vent pipes and fittings have spe- cial
Snorkel
12" Minimum
Figure 9 - Snorkel Termination
Snorkel
12" Minimum
Adequate
Drainage
Figure 10 - Snorkel Termination with Drainage Pipe
For more information, visit www.desatech.com | 8 | 107205 |