INSTALLATION

Continued

1.Frame in rough opening. Use dimensions shown in Figure 13 for the rough opening. If installing in a corner, use dimensions shown in Figure 14 for the rough opening. The height is 33" which is the same as the wall opening above.

2.If using blower, install and properly ground GA3555, three-prong 120 volt electrical out- let, in fireplace. Follow instructions included in kit.

3.Install gas piping into fireplace location. This installation includes an approved flexible gas line (if allowed by local codes) after the equip- ment shutoff valve. The flexible gas line must be the last item installed on the gas piping. See Installing Gas Piping to Fireplace Location, page 13.

4.Carefully set fireplace in front of rough opening with back of fireplace inside wall opening.

5.Carefully insert fireplace into rough opening.

6.Attach flexible gas line to gas supply. See Con- necting Fireplace to Gas Supply, page 14.

7.Attach fireplace to wall studs using nails or wood screws through holes in nailing flange (see Figure 15).

8.Check all gas connections for leaks. See Checking Gas Connections, page 15.

9.Plug electrical cord into electrical outlet installed in step 2.

10.Install brass trim after final finishing and/or painting of wall (see Figure 7, page 9).

Nails or

Wood

Screws

Nailing Flanges

Figure 15 - Attaching Fireplace to Wall

Studs

Mantel Clearances for Built-In Installation If placing mantel above built-in fireplace, you must meet minimum clearance between mantel shelf and top of fireplace opening.

NOTICE: If your installation does not meet the minimum clear- ances shown, you must do one of the following:

raise the mantel to an accept- able height

remove the mantel

17 3/4"

33"

35 1/2"

Figure 13 - Rough Opening for Installing

in Wall

393/8"

27 7/8"

35 1/2" 55 5/8"

Figure 14 - Rough Opening for Installing

in Corner

NOTICE: Surface temperatures of adjacent walls and mantels become hot during operation. Walls and mantels above the firebox may become hot to the touch. If installed properly, these temperatures meet the requirement of the national product standard. Follow all minimum clearances shown in this manual.

12

www.desatech.com

107172-01K

Page 12
Image 12
Desa EFS33NRA, VSGF33NRA installation manual Raise the mantel to an accept- able height Remove the mantel