18

CAST IRON STOVE AND B-VENT BURNER SYSTEM INSTALLATION

Installing Logs, Lava Rock, and Glowing Embers

CAST IRON STOVE AND B-VENT BURNER SYSTEM INSTALLATION

Continued

INSTALLING LOGS, LAVA ROCK, AND GLOWING EMBERS

WARNING: Failure to position the parts in accor- dance with these diagrams or failure to use only parts specifically approved with this burner system may result in property damage or personal injury.

It is very important to install these logs exactly as instructed in Figures 43 through 47 . Do not modify logs. Only use logs supplied with freestanding burner system. Do not use if any log(s) are broken (see Replacement Parts, page 26).

1.Remove glass door. See Removing/Replacing Glass Door, page 17.

2.Place log #1 (back log) on top of grate. Make sure the notches in the bottom of the log fit over the grate (see Figure 43).

2.Rest log #2 (large front log) on the pins on the front part of the grate (see Figure 44).

3.Place log #3 (crossover log) onto the rear and front logs. Make sure it is seated properly into the notch on the front log and over the raised triangular portion of the rear log as shown in Figure 45.

4.Place log #4 (small log) onto the front left part of the grate making sure the notches fits over the prong of the grate. See Figure 46.

5.Lava rock may be placed along sides and front inside burner system bottom. This may not be visible when you have re- placed the front of the stove. It is not necessary to use all of the lava rock provided.

NOTICE: Do not put lava rock on burner or under burner. Placing lava rock on burner could cause performance problems.

6.Pull ember material apart into pieces no larger than a dime. Place these pieces loosely and sparingly directly onto the ex- posed section of the front burner and along the space between the burner and grate prongs (see Figure 47). This will create the glowing ember appearance as the flame touches the ember material. Do not block air slots by using too much ember ma- terial in one area. It is not necessary to use all of the ember material provided.

7.Replace the glass door and stove front. See Removing/Re- placing Glass Door, page 17.

WARNING: The glass door must be securely in place before running this burner system. Do not run this burner system if glass is missing or broken.

3

4

 

1

2

Figure 45 - Installing Log No. 3 Figure 46 - Installing Log No. 4

Figure 43 - Installing Log No. 1

Figure 44 - Installing Log

 

 

No. 2

 

 

Figure 47 - Placing Ember Material on Burner

For

.

.com

106828-01C

Page 18
Image 18
Desa SBVBN(C) Installing LOGS, Lava ROCK, and Glowing Embers, Remove glass door. See Removing/Replacing Glass Door

SBVBP(C), SBVBN(C) specifications

Desa SBVBP(C) and SBVBN(C) are two advanced models in the landscape of environmental and energy-efficient technologies. These innovative designs are at the forefront of sustainable construction, showcasing a plethora of features and characteristics that make them stand out.

One of the main features of Desa SBVBP(C) is its emphasis on bioclimatic architecture, which ensures that buildings harmonize with their surrounding environment. This model incorporates passive solar design principles, allowing natural light to penetrate efficiently while minimizing energy loss. High-performance thermal insulation is another significant characteristic, which helps maintain comfortable indoor temperatures regardless of external weather conditions.

Desa SBVBN(C) complements its counterpart with its remarkable integration of renewable energy technologies. Equipped with photovoltaic panels and wind turbine systems, this model harnesses natural energy sources to reduce reliance on non-renewable energy. The energy generated can be used for lighting, heating, and powering appliances, making the building self-sufficient and cost-effective over time.

Both models utilize smart technology for enhanced operational efficiency. Internet of Things (IoT) devices allow for real-time monitoring and control of energy consumption, promoting sustainable living practices among residents. Automated systems adjust lighting, heating, and cooling based on occupancy and time of day, further contributing to energy savings.

Water conservation is another crucial aspect of Desa SBVBP(C) and SBVBN(C). Both designs implement rainwater harvesting systems and greywater recycling technologies, ensuring that water usage is minimized and reused effectively. This not only lowers utility bills for occupants but also contributes to environmental sustainability by reducing the strain on local water resources.

The construction materials used in both models emphasize sustainability, utilizing recycled, locally sourced, and eco-friendly materials whenever possible. This commitment to green building practices ensures that the overall environmental footprint of the structures is minimal.

In summary, Desa SBVBP(C) and SBVBN(C) represent a paradigm shift towards eco-conscious living. Through the integration of advanced technologies, renewable energy sources, and smart systems, these models provide a blueprint for sustainable development that addresses the pressing challenges of climate change and environmental degradation. As cities around the world seek innovative solutions to improve urban living, models like these shine as beacons of hope and progress.