ALSO IN SELECTING A LOCATION, THE FOLLOWING PRECAUTIONS MUST BE OBSERVED;

1.Do not connect this firebox to a chimney system other than a Vanguard chimney system.

2.Install in an area providing ventilation and adequate combustion air.

3.Due to high temperatures do not locate this firebox in high traf- fic areas or near furniture and draperies.

4.Provide adequate clearances around air openings into the com- bustion chamber. NEVER obstruct the front opening of the fire- box or the flow of combustion and ventilation air.

5.Do not locate in or near an area where gasoline or other flam- mable liquids may be stored. The firebox area must be kept clear and free from these combustible materials.

CLEARANCES

MINIMUM CLEARANCES TO COMBUSTIBLES ARE:

BACK

1/2" MIN.

ADJACENT WALL

12" MIN.

• CHIMNEY OUTER PIPE SURFACES

2" MIN.

• BOTTOM OF FIREBOX TO FLOOR

0" MIN.

SPACERS ON SIDES OF FIREPLACE

PROVIDE REQUIRED 1/2" CLEARANCE

1/2

MIN.

(3)

12

MINIMUM TO

ADJACENT WALL

Figure 3

WARNING: DO NOT BLOCK REQUIRED AIR SPACES WITH INSULATION OR ANY OTHER MATERIAL. DO NOT OBSTRUCT EFFECTIVE OPENING OF FIREBOX WITH ANY TYPE OF FACING MATERIAL. COMBUS- TIBLE MATERIAL MUST NOT BE IN CONTACT WITH THE BLACK FRONT FACE OF THE FIREBOX.

MANTEL CLEARANCES

Woodwork, such as wood trims, mantels, and other combustible materials, should not be placed within 9 inches of the effective opening of this firebox.

The effective opening is considered the opening where actual heat output may occur.

Combustible material above and projecting more than 1 1/2 inches from the front face of firebox (see Figure 4) should not be placed less than 12 inches from the effective opening of the firebox (ref; NFPA std. 7-3.3.3.)

"FALSE" HEADER

2" MIN. TO

 

 

 

 

 

12"

COMBUSTIBLES

DRYWALL

 

SPACERS

 

(NOM)

 

 

COMBUSTIBLE

 

 

VIEW

MATERIALS

 

 

ONLY BEYOND

 

 

"A"

LIMITS SHOWN

 

 

 

 

 

1/2" MIN.

WITHIN 12"

 

 

 

OF EFFECTIVE

9" MIN.

 

OPENING

 

 

 

 

1 1/2"

 

 

MAX.

 

 

SEAL 3/8 GAP FROM

INSULATION

TOP OF FIREPLACE

(DO NOT

TO DRYWALL WITH

REMOVE)

NONCOMBUSTIBLE

 

CAULKING

 

 

VIEW "A"

 

 

11" MIN.

 

 

TO HEADER

 

Figure 4

 

 

 

FRAMING

Construct framing using dimensions shown in Figures 5, 7, and 8, page 5, depending on your particular installation.

If the firebox is to be installed directly on carpeting, tile (other than ceramic), or any combustible material other than wood flooring; the firebox must be installed upon a metal or wood panel extending the full width and depth of the firebox.

Before securing firebox to prepared framing, metal safety strips (provided) must be placed between hearth extensions (not sup- plied) and bottom front edge of firebox to protect against glowing embers (Figure 6, page 5).

If the firebox is to be installed on a raised platform, a "Z-type" metal safety shield (not supplied) must be fabricated to fit your required platform height (see Figure 7, page 5). The shield must be made of (26-28ga) galvanized sheet metal to prevent corrosion.

4

55505

Page 4
Image 4
Desa VPN36 3-SIDED operating instructions Mantel Clearances, Minimum Clearances to Combustibles are