INSTALLATION
Continued
Changing Pilot Orifice
The pilot is provided with a natural gas orifice installed. For propane/LP gas you must remove it and replace it with an propane/LP orifice. The accessory hardware kit contains an propane/LP orifice with a red stripe for converting pilot.
1.Gently loosen and remove pilot line con- nection from bracket (see Figure 14).
2.Replace injector (see Figure 14) with propane/LP pilot injector with red stripe.
3.Replace and tighten pilot line to bracket.
4.Continue with step 3 under Natural Gas Installation, page 10.
Pilot Injector 
Figure 14 - Installing Propane/LP Pilot
Orifice
Testing Burner for Leaks
1.Generously apply noncorrosive leak de- tection fluid to all connections.
WARNING: Never check for gas leaks with open flame.
2.Light burner with shutoff valve no more than half open and holding a match slightly in front of pan (see Lighting In- structions, page 14).
3.Inspect all connections for bubbles, raw gas odor, or flame from any area other than burner (leaks). If leaks are detected, shut off gas valve immediately. Tighten, or reassemble loose connection(s) using pipe joint compound until burner system is leak free.
4.When burner is tested and leak free, observe individual tongues of flame on burner.
Note: Burner design includes more ports on the outside of the bar. Make sure that all ports are clear and producing flame evenly across burner. If any ports appear blocked, clear them by removing burner manifold and reaming ports with a modified paper clip or other suitable tool.
5.When finished testing, turn gas shutoff valve OFF to extinguish all flames.
Adding Pan Material
1.Open bag of ash bed material (vermiculite) and spread it evenly across burner pan to top. You may overflow front and sides of pan to cover entire pan and connecting hardware. Do not cover
2.Open glowing embers and evenly cover ash bed material (vermiculite) in burner pan.
Installing Grate and Logs
1.Place grate over burner pan where two outer horizontal supports on grate fit into two pan positioning notches in rear verti- cal edge of pan.
2.Slide two rear log grate steps over two outer horizontal supports on grate as shown in Figure 15.
3.Place back log on grate onto grate steps (see Figure 16, page 13).
4.Place front log(s) on grate and slide forward against front bars on grate (see Figure 16, page 13).
Grate | Grate Steps |
|
Figure 15 - Installing Grate (Pan Material
Not Shown)
12 | www.desatech.com |