Brick Installation
Brick Panel Installation
IMPORTANT: Installation of brick should be done after the fire- place is placed in a permanent location.
The brick housings are already installed on the panels. When installing brick housing panels into fireplace, wear gloves as edges may be sharp.
1.Beginning with left side panel, place panel, bottom edge first, at an angle into fireplace. Secure to bottom of fireplace with screws provided.
2.Install right side as left side in step 1 using screws provided.
3.Install back panel and secure back to sides and bottom of firebox with screws provided.
4.Using
Hole in
Side Panel
Figure 23 - Hole in Side Panel to Attach
to Firebox Wrapper
Brick Installation
Each brick housing is stamped with a number (full size bricks are not stamped). These num- bers will help identify the brick when installing. It is important to install these bricks exactly as instructed. Press brick firmly into brick housing until it snaps. Groove line on side of brick will come in contact with flange on the brick hous- ing. This secures brick into housing (see Figure 24). Smaller bricks may require a small portion of furnace cement applied to back of brick to secure it until grouting has been completed.
Bricks are packaged in separate boxes. The brick matrixes on pages 15 through 27 show how bricks are packaged and placed for each size fireplace and the number of bricks per box. There are 2 extra full bricks included in Hearth Brick package.
Install bricks one section at a time starting with hearth panel followed by the rear panel, left panel and right panel. It is important to install the bricks in sequence. Please note, full size bricks are NOT stamped.
Stamped
Brick Letter
Location
Flanges
Brick Housing
Figure 24 - Installing Brick
14 | www.desatech.com |