Installation and Setup
10

Site Preparation - IMG 1010
Topic Location: IMG 1010-Installation and Setup Guide > IMG 1010-Hardware
Installation
Ensure that the following requirements are met before you begin installation.
Important: Any variances from the mutually agreed upon site preparation
details (such as power cabling, network cabling, equipment room readiness)
may affect installation scheduling.

Site Preparation Checklist

Requirements Completed
Location
Spacing
Mounting
Power
Electromagnetic Interference
Channel Service Units
Electrostatic Discharge
Protection

Location

The -48 V DC unit must be located in a restricted area, such as a dedicated
equipment room or limited access office.
The 120/240 V AC unit does not have to be located in a restricted area. For
example, it can be located in a clean and well ventilated office space.

Spacing

Allow approximately 76 cm (2.5 ft.) of space in front of the IMG 1010, so that the
tray can be freely removed and maneuvered.