Table of Contents
Section 1 – Installation
1.1 Specifications...........................................................................................................................................17
1.2 Concrete Pad............................................................................................................................................18
1.3 Operator Installation.................................................................................................................................19
1.4 Chain Installation......................................................................................................................................20
1.5 Front Mount Installation ............................................................................................................................21
1.6 Rear Mount Installation.............................................................................................................................22
1.7 Warning Sign Installation..........................................................................................................................23
Section 2 – Wiring
Conduit Requirements..............................................................................................................................25
2.1 High Voltage Connections ........................................................................................................................26
2.2 Control Wiring...........................................................................................................................................27
2.3 Loop Detector Wiring................................................................................................................................28
2.4 Auxiliary Device Wiring.............................................................................................................................29
2.5 Primary / Secondary (Bi-parting) Gate Wiring ..........................................................................................30
2.6 Terminal Identification and Description
2.6.1 Main Terminal (P1)...................................................................................................................31
2.6.2 Secondary Device Terminal.....................................................................................................32
Section 3 – Adjustments
3.1 Circuit Board Adjustments ........................................................................................................................33
3.2 Switch Settings.........................................................................................................................................34
3.2.1 programming Switch Description and Function........................................................................35
3.3 Limit Switch Adjustment ...........................................................................................................................36
3.4 Reverse Sensitivity Adjustment ................................................................................................................37
Section 4 – Operating Instructions
4.1 Power and Reset Switches.......................................................................................................................39
4.2 Shutdown Conditions
4.2.1 Soft Shutdown..........................................................................................................................40
4.2.2 Resetting a Soft Shutdown.......................................................................................................40
4.2.3 Hard Shutdown.........................................................................................................................41
4.2.4 Resetting a Hard Shutdown................................................................................................ .....41
4.3 Manual Gate Operation
4.3.1 Emergency Vehicle Access Conditions....................................................................................42
4.3.2 Fail-Safe Manual Operation..................................................................................................... 42
4.3.3 Fail-Secure Manual Operation.................................................................................................43
Page 14 9310-065-E-5-07