3. INSTALLATION

Unpacking the box to inspect for any damage, which may have occurred during shipment. If there are any damages, please contact your dealer immediately.

3.1BLOWER& MATTRESS INSTALLATION

1.Place the mattress on top of the bed frame. Please note for the foot end.

2.Hang the blower onto bed rail (foot-end), and adjust hangers to best upright position of the blower.

NOTE: Do not place the blower on flat surface, this might block the air intake of blower unit.

3.Connect air hose connectors from air mattress to the blower unit.Make sure the connector is in the right position as the inserted diagram below. Rotate the connector clockwise to the Lock / on position. When a "click" sound is felt or heard, the connection is completed and secured.

NOTE: The blower is only operable at “Lock/On” position.

4.Connect and secure the automatic fowler boost adaptor on the side of the blower unit. The automatic fowler boost sensor pad must snap to the designated location inside the bottom of the mattress foam pocket.

NOTE: This function is only available for 35.4” replacement mattress system.

NOTE: Use the Velcro strips to fasten the cable of fowler boost sensor pad to prevent stumbling.

5. Plug the power cord into electrical outlet.

NOTE:1.Make sure the blower unit is suitable for the local power voltage.

2. The plug is also served to disconnect the device.

CAUTION:The blower can only be applied to the mattress recommended by the manufacturer. Do not use it for any other purpose. (applied part: air mattress)

6. Then turn the main power switch to ON position.

7

8

Page 8
Image 8
Drive Medical Design 14000 instruction manual BLOWER& Mattress Installation