INSTALLATION

2.Using two M5 machine screws and an adapter plate, attach the rail to the front of the rack (see Figure 1 and Figure 2).

Do not tighten the screws.

Front M5 Screws

Position 6

Position 5

Position 4

Position 1

Adapter Plate

Figure 2. Securing the Front Rail

3.Adjust the rail size on the rail assembly for the depth of your rack (see Figure 3).

Rear

Front

Figure 3. Adjusting the Rail Depth (Right Rail Assembly Shown)

EATON Powerware® 9140 EBM User’s Guide S 164201623 Rev A FINAL DRAFT 2006 July 14

19