Use 19

Cancelling a programme

Turn the selector dial to O to cancel a programme which is running. You can now select a new programme.

Opening the door after the programme has started

First set the machine to pause by pressing the button 8. If the pilot light 10.2 blinks some minutes and then goes off, the door can be opened.

If the DOOR remains locked the pilot light 10.2 is on, this means that the machine is already heating, that the water level is too high. In this case the door can not be opened. If you cannot open the door but you need to open it you have to switch the machine off by turning the selector dial to O. After some minutes the door can be opened (pay attention to the water level and temperature!).

After closing the door, it is necessary to select the programme and options again and to press the button 8.

At the end of the programme

The machine stops automatically, the pilot light of the button 8, the pilot lights

10.1and 10.2 go off and a blinking 0 will appear on the display.

If a programme or an option that ends with water still in the tub has been selected, the pilot light 10.2 illuminates, a blinking 0 will appear on the display, the pilot light of the button 8 goes off and the door remains locked to indicate that the water must be emptied out before opening the door.

Follow the below instructions to empty out the water:

turn the programme selector dial to O

select the DRAINING or SPINNING programme

reduce the spin speed if needed, by means of the relevant button

press button 8

when the programme has finished the display shows a blinking 0. The pilot light 10.2 goes off and the door can be opened.

Turn the programme selector dial to O to switch the machine off. Remove the laundry from the drum and carefully check that the drum is empty. If you do not intend to carry out another wash, close the water tap. Leave the door open to prevent the formation of mildew and unpleasant smells.

Page 19
Image 19
Electrolux 63742 VI Cancelling a programme, Opening the door after the programme has started, At the end of the programme