Contents 5
Installation | 36 |
Unpacking | 36 |
Positioning and levelling | 38 |
Water inlet | 38 |
39 | |
Water drainage | 39 |
In the interest of the environment | 41 |
Electrical connection | 41 |
Permanent connection | 42 |
43 | |
Preparation and assembly of the door | 43 |
Environment concerns | 46 |
Packaging materials | 46 |
Old machine | 46 |
Ecological hints | 46 |