INSTALLATION Solid Pipe Installation
FITTING THE APPLIANCE AND CABINET.
1 Make suitable arrangements for gas and electrical supplies into the installation site. Preferably a junction
box or a 3 pin earthed socket should be situated at the back of the cabinet below the oven.
2 Fit cabinet as Fig. 1, making sure that it is level.
3 When unpacking the oven keep it on it's polystyrene base until it is put into the cabinet to avoid damage.
Do not allow young children to play with any part of the packaging.
NOTE: It is imperative that the appliance is left in the base to protect both the appliance and the floor.
4 Remove the oven door. (See section B on page 44).
5 Solid gas pipe installation:
i) Remove the fascia control panel. (See section A on page 43).
ii) See Fig.7. Slacken and remove the union nut on the gas supply elbow on the right hand side of the
control panel.
iii) Remove the two screws on the gas inlet
block Fig.3.
iv) Withdraw the gas inlet block and pipe
assembly from the back of the appliance
v) Remove the union elbow from the inlet
block and pipe assembly. The elbow will
be required in the final installation.
vi) The union elbow should be connected to
the gas supply pipe via a standard
ΒΌ"B.S.P. straight connector.
6 Install the gas supply pipe on site complete with
the union elbow (See Fig.4). Note the
orientation of the elbow, the connection must
be upwards.
7 Position the appliance in front of the cabinet and
run the supply cable (See Section 2) through
the cabinet and connect to the junction box or
socket. Ensure that the supply is isolated at this
stage.
N.B. Two people will be required to carry
out the lifting procedure.
Warning: Do not attempt to lift this appliance by the handle.
8 Lift the appliance into the cabinet making sure the gas supply pipe enters the duct in the rear of the
appliance and the cable is not
trapped by the appliance. Push the
appliance as far back as it will go.
Ensure the supply pipe comes
through the control panel and pull
through any slack cable.
9 Centralise and fix the appliance to
the cabinet using four wood screws
in the position indicated in Fig.2.
NOTE: If fitting the cabinet heat deflectors
they should be located behind the
front frame and secured in position
by the above four wood screws.
10 Tighten the union nut into the supply
elbow.
11 Carry out gas soundness check
NOTE: Check supply pressure before fitting fascia (See Section 3).
41
500

FIG.4

225

mm
75
430
280
120
FIG.3
120
GAS INLET SUPPLY BLOCK