GAS INLET SUPPLY BLOCK
430

INSTALLATION Solid Pipe Installation

FITTING THE APPLIANCE AND CABINET.

1Make suitable arrangements for gas and electrical supplies into the installation site. Preferably a junction box or a 3 pin earthed socket should be situated at the back of the cabinet below the oven.

2Fit cabinet as Fig. 1, making sure that it is level.

3When unpacking the oven keep it on it's polystyrene base until it is put into the cabinet to avoid damage. Do not allow young children to play with any part of the packaging.

NOTE: It is imperative that the appliance is left in the base to protect both the appliance and the floor.

4Remove the oven door. (See section B on page 44).

5Solid gas pipe installation:

i)Remove the fascia control panel. (See section A on page 43).

ii)See Fig.7. Slacken and remove the union nut on the gas supply elbow on the right hand side of the control panel.

iii)Remove the two screws on the gas inlet

block Fig.3.

iv)Withdraw the gas inlet block and pipe assembly from the back of the appliance

v)Remove the union elbow from the inlet block and pipe assembly. The elbow will be required in the final installation.

vi)The union elbow should be connected to the gas supply pipe via a standard ¼"B.S.P. straight connector.

6Install the gas supply pipe on site complete with the union elbow (See Fig.4). Note the orientation of the elbow, the connection must be upwards.

7Position the appliance in front of the cabinet and

 

run the supply cable (See Section 2) through

 

 

120

 

the cabinet and connect to the junction box or

 

 

 

 

socket. Ensure that the supply is isolated at this

 

 

 

 

stage.

 

 

FIG.3

 

N.B. Two people will be required to carry

 

 

 

 

120

 

 

out the lifting procedure.

 

 

 

 

 

 

 

Warning: Do not attempt to lift this appliance by the handle.

 

 

8

Lift the appliance into the cabinet making sure the gas supply pipe enters the duct

in the rear of the

 

appliance and the cable is not

 

FIG.4

 

 

trapped by the appliance. Push the

 

 

 

 

 

 

 

appliance as far back as it will go.

75

 

225

 

Ensure the supply pipe comes

 

 

 

 

mm

 

through the control panel and pull

 

 

 

 

through any slack cable.

 

 

 

9

Centralise and fix the appliance to

 

500

 

 

the cabinet using four wood screws

 

 

 

 

 

 

in the position indicated in Fig.2. NOTE: If fitting the cabinet heat deflectors

they should be located behind the front frame and secured in position by the above four wood screws.

10Tighten the union nut into the supply elbow.

11Carry out gas soundness check

NOTE: Check supply pressure before fitting fascia (See Section 3).

41

Page 41
Image 41
Electrolux EOG 660 manual 500