EMC DS-xxB2 dimensions Assembling the Rails, Location of Keps Nuts

Models: DS-xxB2

1 22
Download 22 pages 6.4 Kb
Page 12
Image 12

Installing the DS-xxB2 Rails

Assembling the Rails

To assemble the rails:

1.Place the front rail down on a table.

2.Insert the slots of the rear adjustable rail onto the threaded posts on the front rail. Be sure that the lip on the top of the rear adjustable rail slides over the top of the slot on the front rail, thereby capturing the ac power cord.

3.Secure the adjustable rail to the front rail with two #10 flat washers and M5 keps nuts. Leave the keps nuts finger tight (see Figure 11).

Keps

Nut

EMC2066S

Figure 11 Location of Keps Nuts

4.Determine where in the rack/cabinet you will locate the switch.

5.Adjust the length of the rail to fit between the channels in the rack/cabinet.

12

EMC Departmental Switch DS-xxB2 Into Third-Party Racks

Page 12
Image 12
EMC DS-xxB2 dimensions Assembling the Rails, Location of Keps Nuts