3
3-42 EMC Fibre Channel Disk-Array Processor Enclosure (DPE) Hardware Reference
Servicing and Upgrading a DPE
Figure 3-31 Installing the Bottom Power Supply
Slot
Latch
C.
With your thumb, push the
latch right until it snaps up.
B.
Align the supply with the enclosure slot
and gently push it into the slot until the
latch moves to the middle of the slot.
A.
Make sure the modules latch is
as far left in its slot as possible.
You may need to brace your
hand against the modules handle.