Emerson 20/20 service manual Maintenance, Checklist

Models: 20/20

1 120
Download 120 pages 9.8 Kb
Page 105
Image 105

Section 21 • Maintenance

Overview

The maintenance screen is a convenient place to keep track of the the maintenance performed and any upcom- ing maintenance recommended by Vilter. Based on this page, banners will be displayed on the lower status bar. Yellow banners are to warn the operator of any upcom- ing maintenance and red banners indicate maintenance that is overdue, see Figure 20-1. Maintenance Screen.

Checklist

The check list is where the operator will perform the maintenance sign-off. Once the operator has selected the item to sign off, pressing the “Update” button at the bottom of the page will perform the sign-off operation and list the maintenance performed in the maintenance log.

Maintenance Name:

This column of tasks that should be performed at the run hours indicated in Maintenance interval column. Select the checkbox from the maintenance task name and press “update” button to perform the sign-off.

Maintenance Interval (Hours):

This column indicates the Run hours at which the task in the first column should be performed. When a task is selected, the maintenance interval will change to reflect the next interval.

Time Remaining (Hours):

This column indicates the Run hours left before the maintenance task should be performed.

Figure 21-1. Maintenance Screen

Vission 20/20 • Operation and Service Manual •Vilter/Emerson • 35391SC 1.8.5153

21 – 1

Page 105
Image 105
Emerson 20/20 service manual Maintenance, Checklist