Emerson 1000 3.4Orient Display for Installation, 3.5Charge Batteries and Perform Battery Startup

Models: 1000 1500 2200 3000

1 32
Download 32 pages 13.16 Kb
Page 14
Image 14
3.4Orient Display for Installation

Installation

3.4Orient Display for Installation

The Liebert PSI XR features a rotating display that may be oriented for either tower or rack installations.

To set the display for your installation, pull out on the display and rotate it until it is oriented correctly, then press it into the UPS until it is seated.

Figure 9 Orienting the UPS display

3.5Charge Batteries and Perform Battery Startup

Before connecting input power or connecting the load, Emerson recommends these steps:

Charge the battery for at least 8 hours.

Start the UPS on battery to ensure the battery is fully functional and charged.

Turn the unit Off and proceed to 3.6 - Connect Input Power and Load.

3.6Connect Input Power and Load

Connect input power to the UPS, then plug the equipment into the outlets on the rear of the UPS. These UPS outlets provide battery backup and surge protection to the equipment when utility power fails, spikes or sags (see Figure 10).

Figure 10 Connect input power and load

 

EPO

 

INPUT

DC 24V

OUTPUT

10

 

Page 14
Image 14
Emerson 1000, 3000, 1500, 2200 user manual 3.4Orient Display for Installation, 3.5Charge Batteries and Perform Battery Startup