Emerson 3000 installation manual Expansion Tank Field-Installedat

Models: 3000

1 88
Download 88 pages 36.41 Kb
Page 57
Image 57
Expansion Tank Field-Installed at

Glycol/GLYCOOL-Cooled Models—Self-Contained Compressor

Figure 27 General arrangement—GLYCOOL models with scroll compressor

Expansion Tank Field-Installed at

 

 

 

Glycol Pump

 

Highest Point in System

 

 

 

Pump

 

 

Drycooler

Drycooler

Unions*

 

 

 

 

Housing

 

Fill*

Electric Box

 

 

 

Coil

 

 

 

 

 

 

 

Fluid

 

 

 

Evaporator

 

Pressure

Return to

Isolation

Coil

 

Pump

 

 

Port*

 

 

Valves*

 

 

Unions*

 

 

 

 

 

Fluid

 

 

Expansion

 

 

 

 

Supply

 

 

Valve

 

 

Hose

 

from Pump

 

 

 

Sensing

 

 

 

 

 

 

Air Vents*

Bib*

Flow Regulating

Sight

 

Bulb

at Top of

 

Valve*

 

Glass

Hot Gas

 

Risers

 

Pressure

 

 

 

External

 

 

Port*

Filter

 

 

Bypass

 

 

 

 

 

Valve

Equalizers

 

 

 

Dryer

 

 

 

 

 

 

 

 

 

 

Service

 

 

 

 

 

 

 

Valves

Scroll

 

 

 

 

 

 

 

 

 

 

 

 

Hot Gas

 

Compressor

 

 

 

 

 

 

 

 

 

 

 

 

Bypass

 

 

Econ-O-Coil

 

 

 

3-Way Water

 

 

Fluid

 

Regulating

Tube

 

Valve

Valve

Fluid

Supply to

Actuator

 

in Tube

Unit

 

 

Condenser

Return

 

 

 

 

from

Econ-O-Cycle

 

 

Unit

Comparator

3-Way Chilled

 

 

Isolation

 

Glycol Valve

 

 

Valves*

 

 

 

Econ-O-Coil

Circuit

Field-Supplied

Reducers

Required on 3-Ton Units

Hose

FACTORY PIPING

Bibs*

 

 

FIELD PIPING

*Components are not supplied by Liebert but are recommended for proper circuit operation and maintenance.

DPN000379

Rev. 03

51

Page 57
Image 57
Emerson 3000 installation manual Expansion Tank Field-Installedat