Figure 25 General
Expansion Tank |
| Glycol | |
Highest Point in System |
|
| |
Drycooler | Unions* | Pump | |
Fill* |
| ||
Electric Box | Drycooler |
| |
|
| Coil |
|
Pump
Housing
Air Vents*
at Top of
Risers
Expansion |
|
| Fluid |
| Isolation |
| Evaporator |
|
| Return |
|
| |||
Port* |
|
| to Pump |
| Valves* |
| Coil |
| Unions* | Fluid |
| Expansion |
| ||
|
|
| Supply |
| Valve |
| |
|
|
| from |
|
|
|
|
Hose |
|
| Pump |
|
|
| Sensing |
Bibs* |
|
|
|
|
|
| |
| Flow Regulating | Sight |
|
| Bulb | ||
|
|
|
| ||||
|
| Valve* |
| Glass |
|
| |
| Pressure |
| Hot Gas | External | |||
| Port* |
|
|
|
| ||
|
|
|
|
|
| Bypass | Equalizers |
|
|
| Filter |
|
| Valve |
|
|
|
|
|
|
|
| |
|
|
| Dryer |
|
| Service |
|
|
|
|
|
| Hot Gas |
| |
|
|
|
|
| Valves |
| |
|
|
|
|
| Bypass |
| |
|
|
|
|
|
| Scroll | |
|
|
|
|
| Solenoid |
| |
|
|
|
|
| Valve |
| Compressor |
|
|
|
|
| Hot Gas |
|
|
|
|
|
|
| Bypass |
|
|
|
|
|
|
|
|
| Tube |
|
|
|
|
|
|
| in Tube |
|
|
|
|
|
|
| Condenser |
|
|
|
|
|
|
| Tube |
Fluid |
| Bypass |
|
|
| in Tube | |
|
|
|
| Condenser | |||
Supply | Valve |
|
|
|
| ||
to Unit |
|
|
|
|
|
| |
Fluid |
|
|
|
|
|
|
|
Return |
|
|
|
|
|
|
|
from | Isolation |
|
|
|
|
|
|
Unit | Valves* |
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
| ||||
|
|
| Regulating |
| |||
|
|
| Regulating Valve |
| |||
|
|
| Valve |
|
| ||
|
|
|
| (optional) |
| ||
|
|
|
|
|
|
| Fluid |
| *Components are not |
|
| supplied by Liebert but | |
| Supply |
| |
Hose |
| are recommended for | |
to Unit |
| ||
Bibs* | Fluid |
| proper circuit operation |
|
| and maintenance | |
| Return |
| |
|
|
| |
| from |
| |
| FACTORY PIPING Unit | Reducers Required | |
| FIELD PIPING | on | DPN000361 |
|
| Rev. 02 |