Emerson 3000 installation manual Expansion Tank Field-Installedat

Models: 3000

1 88
Download 88 pages 36.41 Kb
Page 58
Image 58
Expansion Tank Field-Installed at

Glycol/GLYCOOL-Cooled Models—Self-Contained Compressor

Figure 28 General arrangement—GLYCOOL models with digital scroll compressor

Expansion Tank Field-Installed at

 

Glycol Pump

Pump

 

Highest Point in System

Drycooler

Unions*

Housing

 

 

Fill*

Electric

Drycooler

 

 

 

 

 

 

Box

Coil

 

 

 

 

 

 

 

 

 

Pressure

 

Fluid

 

 

Evaporator

 

 

Return to

 

 

 

 

Isolation

 

Coil

 

Port*

 

Pump

 

 

 

Unions*

 

Valves*

 

 

 

 

Fluid

Expansion

 

 

 

 

 

 

 

 

 

 

Supply

Valve

 

 

 

Hose

 

from

 

 

Sensing

 

 

Pump

 

 

Air Vents*

Bib*

Flow Regulating Valve*

External

Bulb

at Top of

 

 

Pressure

 

Equalizer

 

Risers

 

 

Port*

 

 

Sight

 

 

 

 

 

 

 

 

 

 

 

Glass

 

 

 

 

 

Filter

 

 

Digital

 

 

 

Dryer

Service

 

Solenoid

 

 

 

 

 

Valve

 

 

 

 

Valves

 

 

 

 

 

Digital

 

 

 

 

 

 

 

 

 

 

 

 

Compressor

Tube

in Tube Econ-O-Coil

Condenser

 

Fluid

 

r

 

Valve

 

 

Supply to

 

 

Actuator

 

Fluid

Unit

 

 

 

Return

Econ-O-Cycle

To iCOM Control

from

Unit

Comparator

3-Way Chilled

 

Isolation

3-Way Motorized

 

 

Valves*

Glycol Valve

Ball Valve

 

 

Econ-O-Coil

Circuit

Hose Bibs*

Manual background Field-Supplied

Reducers

Required on 3-Ton Units

*Componentsare not supplied by Liebert but are recommended for proper circuit operation and maintenance.

FACTORYPIPING

FIELD PIPING

DPN001724

Rev. 0

52

Page 58
Image 58
Emerson 3000 installation manual Expansion Tank Field-Installedat